![]() ![]() The method is extended to irregular waves via the hypothesis of equivalence introduced by Saville and is applied to the crown walls of Gijón and Bilbao breakwaters in Spain. The application of the new method requires waves breaking on the armour layer i.e., only broken waves will reach the crown wall. In this paper, a new method based on those previous results, and on further experimental work, using monochromatic waves, is presented. Several methods have been proposed to calculate wave loads on the crown wall, e.g., Iribarren and Nogales, Jensen and Günbak and Gökce. O&M).Crown walls are primarily built to reduce wave overtopping of mound breakwaters. of continuous Ambient Air Quality Monitoring Stations (CAAQMS) for 05 years (01 year warranty +4 yrs. Supply, Installation Commissioning and O&M of 04 nos. Revamping of Electrical installation at E House-I & E House-II at IOHP.Ĭontract teminated. Pump dispateched and would be received by mid December 2023. Construction of pipe line along with VAP completed. Mechanical work like installation of pipe line around transformer i.e pipe manifold system and main header service pipe line are completed. Supply, installation, testing and commissioning of fixed high velocity water spray system for fire protection of two nos. ![]() Supply, Installation, Testing & Commissioning of INDOOR type 11KV VCB ICOG standalone panels. Supply, Laying Testing & Commissioning of HT / LT Cables at different locations of Paradip Port. Providing LT Power Supply to CB-I & CB-II. ĭesign, Engineering, Supply, Installation, Testing & Commissioning of shore to ship power supply facility at Coal Berth-I and Coal Berth-II at Paradip Port Authority on Turnkey basis. Electrical Inspection, Testing and Commissioning will be carried out.Expected date of complition. ĭesign, fabrication, supply, erection and commissioning of Stacker - cum- Reclaimer of capacity 3000TPH.Įrection work completed. substations installed at different locations of Paradip Port Authority with 03 years.įirm has been intimated to complete the work by. Supply, Installation, testing & commissioning of supervisory control and Data Acquisition (SCADA) of Main receiving 10 nos. Also, buying solar power from such producers is also being explored as an alternative.Ĭoal Handling System for Interconnection of Iron Ore Handling Plant (IOHP) to Mechanised Coal Handling Plant(MCHP) at Paradip Port Authority.įor 2nd phase project, Estimate has been prepared. for allotting 50 Acres of land for setting up a 10 MW Solar Power Plant. PPT is moving before High Court of Odisha challeging the Award.Meantime PPA has applied to Odisha Govt. The matter was under arbitration and the award in favour of SSL has been received. Surana Solar Limited(SSL), Secunderabad on Dt. LoI for installation of 10 MW Solar Power Plant was issued in favour of M/s. Installation of 10 MW Solar Power Plant at Paradip Port. Mechanized Dust Suppression system for roads inside prohibited area from Gate No.1 to Gate No.2. 1 approach inside Harbour area.ĭesign, fabrication, supply, erection and commissioning of Stacker-cum-Reclaimer of capacity 3000TPH. in harbour area.ĭevelopment of Storage Plot near JSW Wagon Tippler inside Harbour area.ĭevelopment of Plot near BOT Railway bulb and Gate No. Upgradation and modernization of Fishing Harbour at Paradip in Odisha.Ĭonstruction of New Signal Station at Paradip.Ĭonstruction of Retaining walls in the Stack yard (MCHP area).Ĭonstruction and widening of Concrete Road, Retaining Walls etc. ![]() Development of Western Dock on BOT basis to handle Cape size vessels.Ĭonstruction of South Breakwater Extension, Groynes and Breakwater Toe Protection Wall at Paradip Port.Ĭonstruction of 2nd exit road cum flyover at Paradip as part of additional Port connectivity from National Highway.Ī Road cum Flyover crossing the BOT Rail Tracks to have unobstructed access to the MCHP areas. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |